Potential potting locations
- Removable AC/DC supply
- The cassette holds a transformer, rectifier and power switches. Its inlet, latch and fan passage need to remain usable.
- PoE power circuits
- Switches and sensors control power to groups of ports. Ethernet magnetics and connectors remain outside the fill.
- Standby converter
- This small supply powers management functions before the main switch circuits turn on.
Application testing
Compatibility, cure and assembly performance need testing with the production materials and process.
- PoE and backup supply
- Temperature tests should cover windings, switches and the enclosure at full port allocation and the specified supply-failure condition.
- Insulation after cycling
- Temperature cycling needs to be followed by insulation tests and void inspection between the input and output circuits.
- Service and airflow
- Repeated cassette installation should be followed by cooling, extraction-force and contact-cleanliness checks.