Skip to content

FD503 material applications

E-bike battery management

Local potting can fill an e-bike battery’s separate board compartment while cell sensors, vents, fuses and docking contacts stay accessible.

Removable e-bike battery beside its frame mounting interface in a bicycle workshop.
Illustrative image: potential FD503 application.

Material supply

FD503 grades

Full grade comparison

FD503-TG60S

TG60S is a low-viscosity option for a separate battery-electronics compartment.

Flame-retardant rating
V-0 (UL 94), as listed in the TDS
Mixed viscosity
600-1,200 cps
Working time
30-60 min

FD503-TG60E

TG60E’s low viscosity helps fill the small auxiliary-supply compartment in the BMS head, with a heat path to the housing wall.

Thermal conductivity
≥0.6 W/m·K
Mixed viscosity
1,500-2,500 cps
Working time
30-50 min

FD503-TG101

TG101 is an option for a switch compartment with a heat path to the housing. Its higher density adds mass to the battery.

Thermal conductivity
≥0.9 W/m·K
Mixed viscosity
2,500 ± 1,000 cps
Working time
At least 30 min

TG60S lists V-0 (UL 94) in its TDS. Thermal conductivity, specimen thickness and a test report are not provided. A material rating does not establish the finished assembly’s rating.

Potential potting locations

Protection-switch compartment
The charge and discharge MOSFETs control battery current. Pack contacts and replaceable fuses stay outside the fill.
Cell-monitoring board
This board measures and balances the cells. Cell-sense and temperature leads must keep their specified routing.
Communication power section
Regulators and interface components sit in the pack head. The external connector needs clear access.

Application testing

Compatibility, cure and assembly performance need testing with the production materials and process.

Protection response
Charge, discharge and temperature-protection tests should compare sensor response before filling and in the final battery assembly.
Riding and docking
Vibration, repeated docking and temperature cycling should be followed by checks of board connections, contact alignment and separation around the fill.
Housing protection
Moisture tests must include the complete housing, vents and seals. Material data alone does not establish pack waterproofing or battery-system certification.
More in mobility

Buy from DBSilco

Get a quote for your FD503 order.

Email the grade, quantity and delivery destination. We’ll confirm pricing, A/B pack sizes and delivery terms.

Grade not selected? Include your application and required properties.

Sales email

sales@dbsilco.com